dude ive been hand filing for like a total of like 2 hours on and off. its taking forever. i wish i had a grinder for this, or at least a dremel or something.
Okay, 1st fork is getting grinded tomorrow, should be done. And the 2nd fork is getting welded tomorrow too. Everything should be ready to sell/ship like next week.